What preparations need to be done before PV installation?

Editor:浙江励为科技有限公司 │ Release Time:2026-10-29 
It is necessary to check the roof load-bearing capacity, confirm whether there is long-term shading, communicate with the power grid company for grid-connected conditions, and reserve installation and maintenance space.